Traffic
The traffic analysis for Mound Road will take place in three distinct phases: data collection, existing traffic analysis and future traffic analysis. The components that make up each of these three phases are listed below.
Data Collection
- Collect traffic data and non-motorized data
- Conduct field review
- Vehicle travel time runs
- Saturation flow rate
- Queue lengths
- Pedestrian activity
Existing Traffic Analysis
- Develop existing volumes
- Refine and populate existing Synchro model
- Develop and calibrate existing Vissim model
- Develop Vissim and Synchro calibration methodology section of traffic report
Future Traffic Analysis
- Develop 2050 Future No Build (FNB) volumes
- Develop FNB Synchro models
- Develop Alternatives
- Develop future (2050) Build volumes
- Modify FNB Synchro Models to develop spot improvements
- Develop and document preferred spot improvement recommendations to carry
- forward
- Modify FNB Vissim models to develop preferred corridor long recommendations
- and approved spot improvements
- Finalize traffic technical memorandum
