Prior to the 2020 rebuild of Mound Road the following maintenance and repairs have been completed or are scheduled.
14 Mile to 18 Mile Road : Project includes 3.70 miles of concrete pavement milling, joint repair, hot mix asphalt overlay, drain improvements, curb, gutter, sidewalk, and ramps. The roadway will be open to through traffic with lanes closures in place during resurfacing and construction operations. Timeline: July 2018 – November 2018.
I-696 to 14 Mile Road : Project includes 3.20 miles of joint repair using hot mix asphalt. The roadway will be open to through traffic with lanes closures in place during repair and construction operations. Timeline: Fall 2018 – Spring 2019.